Defence Industry

Defence Industry

Visit website
Defence

We've partnered with a wide range of companies from consumer goods to sporting and industrial manufacturing. The lightweight, robust and resilient characteristics of C-Tech composite tubeware make it ideal for numerous applications.

KEY CUSTOMERS

• Oceania Aviation • Universal Field Robots • Jamco • SailGP • NZ Defence Force • Atherton Bikes • Gecko Robotics • Heliguy • Greentech Robotics • IMDEX

CAPABILITIES

2,000m2 Auckland composite factory with 600m2 clean room

3,000m2 Castellón factory (operational 2024)

Stock & experience with prepreg Carbon and Glass fibre

Roll wrapped tubes 10mm to 1.4m diameter

Inhouse male & female mould  manufacture

10x1.5m Eastman S125 flatbed material plotter

Tube roll wrapping machines

Autoclave – max 7bar, 180˚C, 15.3m length, 1.44m diameter

Routech  R200 5 Axis CNC router with 5.5x1.5x1m envelope

Round tube sanding machines up to 100mm diameter

9x3x2m paint spray booth with extraction

Bespoke manufacture of metal parts integrated with composites

KEY MARKETS (LOCAL / INTERNATIONAL & POTENTIAL)

• Aerospace • Automotive • UAV • Marine • Film Production • Agriculture

DISCRIMINATORS

100%  New Zealand Owned

25  years of operation

Extensive  knowledge with prepreg resins, foam cores and surface finishes

Inhouse  design & engineering team

Extensive  experience producing high performance composite parts

Demonstrated  capability for build of composite aerospace structures including fuselages,  fairings & spray booms.

Next Project

How it works

Creating your custom order is easy. Our team works with you to develop and meet your precise design and performance specifications.

Enquire
01.
Get in touch

Tell us more about your idea or vision in our easy-to-fill online form.

02.
Choose your specs

Our technical experts will scope out the needs, requirement and specs for your project.

03.
Finalise your quote

Once you’ve confirmed on your bespoke solution, we’ll create a competitive quote.

04.
Start production

After you’ve confirmed your quote, we’ll begin to manufacture your product. This typically takes X weeks but may be longer depending on your requirements.

05.
Get in touch

We generally ship orders within 10-15 business days within New Zealand.
See International Shipping +

Stay up to speed on the latest at C-Tech