Canting Keel

Canting Keel

Visit website
Marine

FARR 36 Kaizen

C-Tech worked with Pure Design on a cost effective process to build the composite canting keel to a high specification and fine tolerance. Our objective was to build a fin that was longer, a lot lighter, had a smaller chord with less deflection compared to the old keel – and a shape and fairness that you would expect in a dinghy fin.

"We are a customer of C-Tech battens on Kaizen and had heard about some of their Americas Cup work, so when we came to build a new keel we put C-Tech on the list to approach. Coming from our One Design Sailing background we know that C-Tech deliver both quality and precision and as passionate sailors themselves, you are going to get ideas and contribution to a better end product." – Andy Robertson, Kaizen Owner

challenges

CHALLENGE #001

manufacturing tolerances

The deliverable for this project was a a high performance composite keel built to fine tolerances with some cost limitations. Quality and process cannot be compromised on a keel so some innovative solutions were required.

S O L U T I O N

Building a mould was cost prohibitive so C-Tech decided to use a multi-step machining process to control shape and tolerances throughout the build. C-Tech worked closely with Pure Design to align engineering with the manufacture process. The structural core of the keel was built from autoclave-cured carbon fibre plate. The process minimised wastage and ensured uncompromised quality with the laminate stack optimised. Foam was integrated to provide fairing around the structure. The keel was machined in 5 steps to achieve a tolerance within a a fraction of a mm.

Next Project

How it works

Creating your custom order is easy. Our team works with you to develop and meet your precise design and performance specifications.

Enquire
01.
Get in touch

Tell us more about your idea or vision in our easy-to-fill online form.

02.
Choose your specs

Our technical experts will scope out the needs, requirement and specs for your project.

03.
Finalise your quote

Once you’ve confirmed on your bespoke solution, we’ll create a competitive quote.

04.
Start production

After you’ve confirmed your quote, we’ll begin to manufacture your product. This typically takes X weeks but may be longer depending on your requirements.

05.
Get in touch

We generally ship orders within 10-15 business days within New Zealand.
See International Shipping +

Stay up to speed on the latest at C-Tech